<p>Atlantic Industrial Coatings was given $14.7m no-bid contract and its findings contradict president’s claims of vandalismThe company hired to renovate the Lincoln Memorial reflecting pool has acknowledged that “human oversight” and flaws in the repair plan caused the newly installed blue liner to pe</p>