Powering AI is an architecture problem
On July 22, 2026, a transmission line fault in Ashburn, Virginia—the heart of the world’s largest data center cluster—knocked more than 3 gigawatts of load off the grid in seconds. And it wasn’t the first time. Two years earlier, a single failed surge arrester dropped roughly 60 Virginia

<p>On July 22, 2026, a transmission line fault in Ashburn, Virginia—the heart of the world’s largest data center cluster—knocked more than 3 gigawatts of load off the grid in seconds. And it wasn’t the first time. Two years earlier, a single failed surge arrester dropped roughly 60 Virginia</p>